MSME TESTING CENTER ENTER EQUIPMENT DETAILS



Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests (Single phase equipment)
IEC 61000-4-29
Testing electrical and electronic equipment when subjected to voltage dips, short interruptions or voltage variations on d.c. input power ports.
Duration (working days) Test/Calibration Charges (In Rs.) without GST
Customer cell to testing Dept. Test/Calibration Duration Final report preparation Sample Quantity MSME Units Non MSME BIS
1 1 1 1 10800.00 12000.00
Approved Status
Test/Calibration Type
Above charges are applicable to single phase equipment