MSME TESTING CENTER ENTER EQUIPMENT DETAILS



Telecom surge test
IS 14700 (Part 4/Sec 5), IEC 61000-4-5
Lightning strokes into high voltage power distribution systems are causing transients in low voltage power mains networks. Via coupling these transients can also be detected in data bus systems, I/O lines and any cabling in the industrial area.
Duration (working days) Test/Calibration Charges (In Rs.) without GST
Customer cell to testing Dept. Test/Calibration Duration Final report preparation Sample Quantity MSME Units Non MSME BIS
1 1 1 1 10800.00 12000.00
Approved Status
Test/Calibration Type