MSME TESTING CENTER ENTER EQUIPMENT DETAILS



Surge Test (Single phase equipment)
IS 14700 (Part 4/Sec 5), IEC 61000-4-5
Switching heavy inductive or capacitive loads in low voltage power mains supply systems are causing transients of high energy and high voltage, depending on the installation category.
Duration (working days) Test/Calibration Charges (In Rs.) without GST
Customer cell to testing Dept. Test/Calibration Duration Final report preparation Sample Quantity MSME Units Non MSME BIS
1 1 1 1 10800.00 12000.00
Approved Status
Test/Calibration Type
Above charges are for single phase equipment, per port